Skip to content

Existing Conditions

Providing architects with comprehensive building documentation through laser scanning & building information modeling.

Providing architects with comprehensive building documentation through laser scanning & building information modeling.

GET STARTED

Existing Conditions Brand Resources EXISTING CONDITIONS LOGO 1 C WHITE CMYK copy

(Virtual) Passive House MA: May Meeting

MAR 2020 PHMA
  • COST

    Free and open to the public.

  • TYPE

    Webinar

  • AUDIENCE

    Professionals

Join us for our next monthly meeting, now online featuring a presentation from Michelle Apigian AIA of ICON Architecture on their new multi-family PH project in Gloucester:

In the heart of historic downtown Gloucester, Harbor Village will create 30 new mixed-income rental units in the second affordable Passive House building in the State. Just blocks from the waterfront, this building introduces new vibrancy to a long abandoned parcel, with three new commercial spaces that will enliven Main Street and provide opportunity for local entrepreneurs. Community input helped shape the design of this 4-story building, with an emphasis on thoughtful integration with the character of the existing neighborhood. The site also provides carefully screened surface parking and co-located community and laundry space. This mix of one- two- and three-bedroom units feature continuous, balanced ventilation, triple paned windows and all electric heating and cooling systems, for healthy, comfortable living. The team is actively collaborating to anticipate critical upcoming details in the look ahead and review them in 3D axonometric views intended to confirm sequencing, trade interaction and constructability.

Instructions to join the online meeting will be sent out to all registered participants.

Gillette trim2

Leading-Edge, Sustainable Stadium Design

Professional sports stadiums form large complexes with enormous impacts on the environment and local communities. In this video/CEU the executives and consultants involved in the design and daily operation of Gillette Stadium and Mercedes-Benz Stadium discuss the challenges and opportunities of sustainable stadium design.

Executives and consultants involved in the design and daily operation of Gillette Stadium and Mercedes-Benz Stadium discuss the challenges and opportunities of sustainable stadium design.

Register

EXCEL CMYK Logo